Item Coversheet
AGENDA ITEM REQUEST


Originating Department:  Utilities

Item Title:  Agreement

Item Number:  4EMeeting Date:  1/27/2026

City Reference Number (C#):  C25329



Item Description:

A Resolution of the City of Sunrise, Florida, approving a “Project Agreement between the City of Sunrise and BCC Engineering, LLC, for Project Agreement No. PA-25-017-BE Osprey South Water Distribution and Service Line Replacements;” and providing an effective date. City Manager Mark Lubelski. Rodrigo de Castro, Director of Utilities.




Funding:

465.66.70.533.506502 – Construction Design

Project 507209 – Osprey and Sunset Bay Watermain Replacement



Amount:
$310,040.48



ATTACHMENTS:
Description
ATY Resolution - C25329
Project Agreement PA-25-017-BE
Basis and Justification Memo



Background:

The Utilities Department has a utility service area wide program to improve the water distribution system and replace aging infrastructure. This program identifies areas based on age, required number of repairs and operational needs. Several communities within the Residents of Sawgrass Mills area have been identified and included in the Capital Improvement Program. The Osprey South subdivision within the Residences of Sawgrass Mills community is recommended for the replacement of water distribution and water service lines. Some of these service lines from the distribution main to the meters are older galvanized steel or thin-walled polyvinyl chloride (PVC). In some cases, the bedding used to support the existing pipe is coral rock and tends to damage the pipe over time due to settlement and variable loading of traffic. As a result of such conditions, and the volume of break repairs that have occurred, these water mains and service lines are recommended for replacement.

 

The Utilities Department developed Project Agreement PA-25-017-HR with BCC Engineering, LLC one of the City’s water, wastewater, reuse and natural gas continuing services consultants, for design, permitting and bidding services. As part of this project, BCC Engineering will complete data collection including project survey and geotechnical services, to develop construction design drawings and specifications. BCC Engineering will prepare permit documents for applicable agency approvals and assist with bidding services for contractor solicitation and award.

 

Staff negotiated a fee for these professional services with BCC Engineering, LLC, that is considered fair and reasonable for the scope and complexity of the work. This project is included within the City’s Five-year Capital Improvement Program and is listed in item number 3 in Exhibit ‘A’ Scope of Services of the Continuing Services Agreement with BCC Engineering, LLC.




Department Head Recommendation:
Approval



Person With Additional Information: 
Name: Aleksis Feirvezers, Project Manager Phone: 954-888-6050



Department Head Name and Title:
Rodrigo de Castro, P.E. Director of Utilities



City Manager:
Authorized for agenda placement